Skip to content
SUQQ
Waterproof Dog Training Leash 50FT 30FT 15FT 10FT 5FT Heavy Duty Recall Long Lead for Large Medium Small Dogs (50FT, Orange)
1 / 6 Hover to zoom

NIMBLE

Waterproof Dog Training Leash 50FT 30FT 15FT 10FT 5FT Heavy Duty Recall Long Lead for Large Medium Small Dogs (50FT, Orange)

SKU: Z228A972C047AEE23B062Z

4.8(12)
660+ sold
AED 194

Inclusive of VAT

Hurry — only 1 left in stock!

1

Coupons & Offers

SUQQ GOGet it by Fri, Oct 2 — Free delivery

Deliver to Dubai ·

14-day returns — free & easy

Sold by

CLIQNSHOP

Visit Store

Why with SUQQ

  • Secure payment
  • Verified sellers
  • Fast UAE delivery

Payment options

VISAVisaMastercardCOD

4.8

Based on 12 reviews

5★
4
4★
5
3★
2
2★
1
1★
0
Sort
J

John S. Verified Purchase

19 Jul 2026

Better than expected

Packaging was secure and the item was exactly as pictured.

F

FGT U. Verified Purchase

21 Jun 2026

Really pleased

Delivery was faster than the estimate and everything arrived intact.

U

URbazaar Verified Purchase

29 Apr 2026

Does the job

Works well, though the instructions could be clearer.

S

SUQQ shopper Verified Purchase

21 Apr 2026

Arrived quickly and well packed

Quality feels solid and it matches the description on the page.

Q

QinFou-UAE Verified Purchase

27 Feb 2026

Decent but not perfect

Works well, though the instructions could be clearer.

Z

ZCM H. Verified Purchase

13 Jan 2026

Arrived quickly and well packed

Using it daily for a few weeks now with no issues at all.

M

Marco S. Verified Purchase

24 Dec 2025

Solid quality

Works well, though the instructions could be clearer.

C

Campus S. Verified Purchase

10 Nov 2025

Really pleased

Packaging was secure and the item was exactly as pictured.

Frequently bought together

Waterproof Dog Training Leash 50FT 30FT 15FT 10FT 5FT Heavy Duty Recall Long Lead for Large Medium Small Dogs (50FT, Orange)

AED 194

Houdini™ Escape Proof Cat Harness and Leash Set by OutdoorBengal – Tactical Vest for Walking – Comfy, Adjustable and Lightweight - Houdini Cat Harness Escape Proof for Cats + Cat Leash (Multicolor, M)

AED 224.70

Nite Ize NiteDog Rechargeable LED Collar - Light Up Dog Collar with Durable Metal Buckle - Water-Resistant & Rechargeable Collar - Dog Supplies for Night Activities - Medium, Blue

AED 183

Total for 3 items

AED 601.70

More from NIMBLE

Similar items

You May Also Like

AED 194