Skip to content
SUQQ
Rypet Reflective Cat Long Leash - 50 FT Escape Proof Walking Leads Yard Long Lead Durable Safe Personalized Extender Leash Traning Play Outdoor for Kitten, Puppy, Rabbit and Small Animals
1 / 6 Hover to zoom

Rypet

Rypet Reflective Cat Long Leash - 50 FT Escape Proof Walking Leads Yard Long Lead Durable Safe Personalized Extender Leash Traning Play Outdoor for Kitten, Puppy, Rabbit and Small Animals

SKU: Z43675FDC3A2C96268AEEZ

4.8(12)
504+ sold
AED 95

Inclusive of VAT

Hurry — only 1 left in stock!

1

Coupons & Offers

SUQQ GOGet it by Sat, Oct 3

Deliver to Dubai ·

14-day returns — free & easy

Sold by

CLIQNSHOP

Visit Store

Why with SUQQ

  • Secure payment
  • Verified sellers
  • Fast UAE delivery

Payment options

VISAVisaMastercardCOD

Size: Leash length: 50 ft. This long cat leash is perfect for pet playing/training/camping/hiking/running/travel, free movement without restraint, and controls pets to avoid loss within your line of sight.. Comfortable: The cat long leash is sturdy and durable yet light enough not to bother your cat. The pet will be happy roaming outside safely without running off after birds and wildlife, and without having our eyes on her 100% of the time. Great for hiking, camping, training, hunting, backyard, beach, recall training, outdoor play with tennis balls, and so on.. Reflective For Night Safety: Highly reflective threads cat leash can good protect your kitten at night by improving its visibility. And keep you both safe and visible on your late-evening walks.. Durable & Tangle-Free: The long cat leash is made using super light-weight 0.2 inch braided nylon rope that is both durable and environmentally friendly. The clip is a strong, nickel-plated iron that won’t break. It’s designed to be tangle-free and won’t get caught on underbrush.. 2 Hook Design: This long leash has a secure spring hook at either end of the leash. 360° swivel clasp design, no limtation for your pets while moving from side to side without messing the leash. Enjoy the peace of mind with our 360° swivel leash attachment, allowing your pets to move freely around you.

Frequently bought together

Rypet Reflective Cat Long Leash - 50 FT Escape Proof Walking Leads Yard Long Lead Durable Safe Personalized Extender Leash Traning Play Outdoor for Kitten, Puppy, Rabbit and Small Animals

AED 95

200PCS Mini Resin Ducks Tiny Garden Micro Landscape Ornament Dollhouse DIY Decor Aquarium Party Prank Christmas Birthday Craft Bulk Little Potted Hide and Seek Game Figurines Potted Charms

AED 92.61

Tetra TetraPro Goldfish Crisps Fish Food enhanced with biotin for optimal health 303 oz

AED 74.84

Total for 3 items

AED 262.45

More from Rypet

Similar items

You May Also Like

AED 95