Skip to content
SUQQ
15M HDMI Cable HIGH SPEED Long Lead with Ethernet ARC 3D | Designed in the UK | Full HD 1080P Compatible with PS4 Xbox One Sky HD TV Laptop PC Monitor CCTV
1 / 4 Hover to zoom

Raxoom

15M HDMI Cable HIGH SPEED Long Lead with Ethernet ARC 3D | Designed in the UK | Full HD 1080P Compatible with PS4 Xbox One Sky HD TV Laptop PC Monitor CCTV

SKU: Z0D83106D1C6210813D2AZ

4.9(10)
550+ sold
AED 75.95AED 157.9052% off

Inclusive of VAT

Hurry — only 1 left in stock!

1

Coupons & Offers

SUQQ GOGet it by Sun, Oct 4

Deliver to Dubai ·

14-day returns — free & easy

6-month warranty — manufacturer-backed

Sold by

Raxoom Store

Visit Store

Why with SUQQ

  • Secure payment
  • Verified sellers
  • Fast UAE delivery

Payment options

VISAVisaMastercardCOD

Our HDMI cables are made to the highest standards. Featuring copper cable and double shielding to ensure smooth data transmission with no interference Our long cables are ideal for extending your HDMI signal to other areas of the home or workplace. With a durable PVC jacket for easy routing in challenging areas These cables are compatible with a range of devices that support HDMI. A perfect match for CCTV, Virgin Media HD and Sky HD TV, PS4 & Xbox One Gaming Consoles, Blu-Ray & DVD Players, Home Cinema, AV Receivers, PC, Laptops, HDTV, Freesat, Freeview, Projectors. They are not compatible with Sky Q, PS4 Pro, Xbox One X and 4K Blu Ray Players when resolution in set higher than 1080p High Resolutions from 720p, 1080i and 1080p at 60Hz. No picture degradation at longer lengths Enhanced Features with Ethernet & ARC Support: This HDMI cable includes Ethernet connectivity, enabling internet sharing between devices, and Audio Return Channel (ARC) support for better sound synchronization, making it perfect for home theater systems.

Frequently bought together

15M HDMI Cable HIGH SPEED Long Lead with Ethernet ARC 3D | Designed in the UK | Full HD 1080P Compatible with PS4 Xbox One Sky HD TV Laptop PC Monitor CCTV

AED 75.95

Abystar Wireless Charging AntiSlip Mat for Grand Highlander 2024 2025 2026 Black Silicone Protective Pad Liners for Grand Highlander Accessories

AED 87.87

Seloky USBC PD Trigger Board Module PDQC Decoy Fast Charge USB Typec to 12V High Speed Charger Power Delivery Boost 4PCS

AED 77.10

Total for 3 items

AED 240.92

More from Raxoom

Similar items

You May Also Like

AED 75.95AED 157.9052% off