Skip to content
SUQQ
10M HDMI Cable HIGH SPEED Long Lead with Ethernet ARC 3D | Designed in the UK | Full HD 1080P Compatible with PS4 Xbox One Sky HD TV Laptop PC Monitor CCTV
1 / 4 Hover to zoom

Raxoom

10M HDMI Cable HIGH SPEED Long Lead with Ethernet ARC 3D | Designed in the UK | Full HD 1080P Compatible with PS4 Xbox One Sky HD TV Laptop PC Monitor CCTV

SKU: ZA99BAE50BD19B8AF37DBZ

4.7(10)
510+ sold
AED 61AED 12852% off

Inclusive of VAT

Hurry — only 1 left in stock!

1

Coupons & Offers

SUQQ GOGet it by Sun, Oct 4

Deliver to Dubai ·

14-day returns — free & easy

6-month warranty — manufacturer-backed

Sold by

Raxoom Store

Visit Store

Why with SUQQ

  • Secure payment
  • Verified sellers
  • Fast UAE delivery

Payment options

VISAVisaMastercardCOD

Our HDMI cables are made to the highest standards. Featuring copper cable and double shielding to ensure smooth data transmission with no interference Our long cables are ideal for extending your HDMI signal to other areas of the home or workplace. With a durable PVC jacket for easy routing in challenging areas These cables are compatible with a range of devices that support HDMI. A perfect match for CCTV, Virgin Media HD and Sky HD TV, PS4 & Xbox One Gaming Consoles, Blu-Ray & DVD Players, Home Cinema, AV Receivers, PC, Laptops, HDTV, Freesat, Freeview, Projectors. They are not compatible with Sky Q, PS4 Pro, Xbox One X and 4K Blu Ray Players when resolution in set higher than 1080p High Resolutions from 720p, 1080i and 1080p at 60Hz. No picture degradation at longer lengths

Frequently bought together

10M HDMI Cable HIGH SPEED Long Lead with Ethernet ARC 3D | Designed in the UK | Full HD 1080P Compatible with PS4 Xbox One Sky HD TV Laptop PC Monitor CCTV

AED 61

MagSafe Charger white

AED 45

Laptop Stand for Desk, Portable Adjustable Laptop Holder for Relieve Cervical Fatigue, Foldable Computer Stand with 360° Rotating Base and Phone Stand, Ergonomic Ventilated Cooling Notebook Stand for MacBook Air, Tablet

AED 41.46

Total for 3 items

AED 147.46

More from Raxoom

Similar items

You May Also Like

AED 61AED 12852% off